For most Worsley homeowners, the best way to get a bigger kitchen, dining and family space without moving is a single-storey rear extension, with a side or wraparound extension where the plot allows. Which one suits you depends on your garden, your neighbours, your budget and what the planners will accept. We are Complete Property Solutions, a family-run building company with more than 35 years of experience, and we manage kitchen extensions from design through to completion, on a fixed-price quotation. This guide compares the real options so you can see which fits your house in Worsley, Walkden or Boothstown.
TL;DR
- A rear extension is the most common route to a larger kitchen-diner. A side extension suits houses with unused space alongside. A wraparound combines the two.
- Single-storey extensions typically cost around £1,800 to £3,000 per m² before the kitchen itself, so work from your own drawings rather than a headline figure.
- Permitted development can cover some extensions, but approval is never automatic. Building Regulations apply to most extensions whatever the planning route.
- Allow three to six months on site for a straightforward single-storey build, plus design and approvals before that.
- A site visit and a fixed-price quotation tell you far more than any online range.
Table of Contents
- Why extend in Worsley rather than move
- Your kitchen extension options compared
- Layout, light and garden access
- What affects the cost
- Planning permission and Building Control in Worsley
- How long it takes and what the build is like
- Common mistakes to avoid
- Why homeowners choose us
- Our view from the job
- Talk to us about your Worsley kitchen
- FAQs
- Sources
Why extend in Worsley rather than move
Moving means stamp duty, agent and legal fees, removal costs and the risk of landing in a house with the same problems. Extending lets you stay near your school, your neighbours and your commute along the M60 and the East Lancs Road. Worsley has plenty of 1930s semis, 1960s and 70s family homes and larger detached houses with long gardens, and many have a small separate kitchen and a dining room that is barely used. Opening those up into one light, sociable room is often the single biggest improvement a family can make.
We do not promise a figure for what an extension adds to your property’s value. That depends on the street, the market and the quality of the build. What we can say is that a well-planned kitchen-diner changes how you use the whole house every day.
Your kitchen extension options compared
There are five realistic routes. Here they are side by side.
| Option | Best for | What it gives you | Main things to check |
|---|---|---|---|
| Single-storey rear extension | Semis and detached homes with garden depth | Open-plan kitchen, dining and family space, direct garden access | Depth limits, neighbours, drainage, the 50% rule |
| Side extension | Houses with a side passage or driveway | Wider kitchen, utility or boot room | Boundary distance, access, drains |
| Wraparound extension | Families needing a major layout change | Rear and side combined in one footprint | Planning route, structural steel, cost |
| Garage conversion into kitchen or dining space | Attached garages | Extra room without a new foundation | Insulation, floor level, Building Regulations |
| Replacing an old conservatory with a solid-roofed extension | Under-used conservatories | A warm, year-round room on an existing base | Foundations, roof design, glazing limits |
Our recommendation for most Worsley homes is the rear extension, extended sideways where the plot allows. It delivers the most usable kitchen space for the cost, and our kitchen extensions service covers the design, build and finishing from start to end.
Rear extensions
This is the classic. You push the back of the house into the garden and create a kitchen-diner, often with a snug or family seating area. A published project in Ellenbrook, Worsley, replaced a conservatory with a rear kitchen extension that added around 2m across the full width of the house, with two sets of bi-folding doors and a vaulted roof with three rooflights. It shows how even a modest depth can change a room when it spans the whole rear wall.
The common mistake is making the extension deep but dark. Depth only helps if light reaches the middle of the room, which is where rooflights and wide glazing earn their place.
Side extensions
If you have a gap beside the house, a side extension can widen a narrow kitchen into a proper dining space without losing garden. It works well on the end of a terrace or semi, and on detached houses where the driveway is wider than you need. Access for materials and drainage runs are the two practical points to settle early, because they affect both cost and programme.
Wraparound extensions
A wraparound extends to the rear and the side in one build. It suits families who want a large open-plan kitchen, dining and living area plus a utility room or study. It usually involves more structural work, including steel beams where walls come out, so we cover it at design stage with the structure in mind. See our house extensions page for single-storey, wraparound and double-storey projects.
Garage conversions
If you have an integral or attached garage next to the kitchen, removing the dividing wall can create a much bigger kitchen and dining area without building new walls outside. Our garage conversions service handles this, and the key issues are insulation, damp-proofing, floor levels and compliance with Building Regulations.
Replacing a conservatory
Many Worsley homes have a conservatory that is too hot in summer and too cold in winter. Rather than live with it, a solid-roofed, insulated extension on the existing base can give you a proper kitchen-diner. Whether the old foundations are suitable has to be checked on site.
Layout, light and garden access
Good layouts start with how you live. Who cooks, who sits at the island, where do the children do homework, where does the muddy football kit go? Answer these before you draw anything.
Zones. Most successful kitchen-diners have three zones: cooking, eating and relaxing. An island or peninsula separates them without walls.
Storage. Tall larder units, a utility room or a boot room by the side door keep clutter out of the main space. In a side or wraparound extension, a utility run along the old party wall is often the neatest solution.
Natural light. Rooflights bring daylight deep into the room and can be placed over the island or dining table. Part L of the Building Regulations limits glazing in an extension to a maximum of 25% of the floor area unless extra calculations are carried out before work starts. So a glass-heavy design needs to be planned properly, not added late. This is also why energy performance and style need to be designed together.
Ventilation. The same guidance sets minimum trickle vent areas for habitable rooms, and an open-plan kitchen-diner is expected to have several. Good design places these discreetly so you never notice them.
Bifold or sliding doors?
Both give you garden access and light. The differences are practical:
- Bi-folding doors fold back to open almost the whole width, which suits a kitchen that flows onto a patio for summer entertaining. They have more frames and sightlines when closed.
- Sliding doors have fewer, slimmer frames and bigger panes, so the garden view is cleaner. They open up to around half of the width at a time.
We install bi-folding doors and aluminium doors, so you can choose the style that suits your garden and your budget. For a small garden where you use the doors constantly, many families prefer sliding for simplicity. For a long garden and big gatherings, bifolds make the most dramatic opening.
What affects the cost
A kitchen extension has no single price, and any article that gives one is guessing. The Federation of Master Builders says single-storey extensions cost around £1,800 to £3,000 per m², and recommends a 10 to 15% contingency and allowing for 20% VAT on most extension work. Homebuilding’s 2025 guide gives £1,750 to £2,350 per m² excluding VAT, so a 30m² single-storey kitchen extension falls between £52,500 and £70,500 before fees and contingency. Ideal Home suggests budgeting £2,200 to £2,500 per m² for the structure itself, then adding the kitchen fit-out on top.
Regional pricing also matters. A Q1 2026 guide based on BCIS benchmarks says the same project costs 20 to 30% more in London than in the North of England. Treat all these figures as published ranges for their year, not a quote for your home.
The five things that move the price
- Size. More floor area costs more, but not in a straight line. Fixed costs such as kitchen fitting, steel and drainage do not shrink with a smaller room.
- Specification. Rooflights, large glazed doors, underfloor heating, bespoke joinery and the kitchen itself make the biggest swings. In Homebuilding’s worked £51,000 example, structure was £20,000 and kitchen units and worktops £15,000, with bifold doors at £3,500.
- Access. Narrow side passages, no vehicle access or tight driveways mean more hand-carrying and more time on site.
- Drainage. Building over or near a public sewer, or moving a gully or manhole, needs extra work and can add cost.
- Structural alterations. Removing a wall between kitchen and dining room needs a steel beam, calculations and Building Control sign-off. We cover this under our structural alterations service.
Can you build an extension for £20,000?
Only a very small one. One 2026 guide puts a 3m by 3m rear extension at £18,000 to £28,000 excluding VAT, and with a mid-range kitchen fit-out the same size rises to £36,000 to £55,000. A £20,000 budget may suit a modest box or a garage conversion, but not a full kitchen-diner with glazing.
Our extension cost calculator gives you a first idea for the North West, and we then confirm it with a fixed-price quotation after a site visit.
Planning permission and Building Control in Worsley
Planning permission and Building Regulations are two separate systems, and approval is never automatic.
Permitted development. Many single-storey rear extensions can go ahead without a full planning application if they stay within set limits. In England these are normally up to 4m for a detached house or 3m for any other house. Larger rear extensions may go through a neighbour-consultation process called prior approval. If your house is listed, in a conservation area, or has had previous extensions, the rules differ, so check with Salford City Council, which covers Worsley, before you finalise anything. Our guide to permitted development for extensions explains the basics.
The 50% rule. Permitted development is not allowed if the new buildings in your garden, other than the original house, would cover more than half the land around it. Sheds, outbuildings and earlier extensions count towards that total.
Building Regulations. These cover structural safety, fire, ventilation, drainage, electrics and energy efficiency, and most extensions need approval whichever planning route you take. The FMB notes that new cabinets and worktops alone would not normally need approval, but the wider project usually does. Our Building Regulations knowledge for garage conversions in our building regulations guide applies in the same spirit to kitchen projects.
Party wall. If you build on or near a boundary or dig close to a neighbour’s foundations, you may need to serve notice under the Party Wall Act. Raise it early and keep neighbours informed.
How long it takes and what the build is like
The FMB says a straightforward single-storey extension takes three to six months to build, not counting design, approvals or the builder’s lead-in time. Homebuilding puts the average at around 12 weeks for a single-storey kitchen extension, longer with architectural glazing or when the whole ground floor is remodelled. Allow time before the build too: drawings, any planning decision and Building Control notices all take weeks.
A typical sequence looks like this:
- Site visit and brief. We look at the house, garden, access and how you want to live.
- Design and drawings. Layout, structure, glazing and kitchen position are agreed.
- Approvals. Planning route and Building Regulations are settled before work starts.
- Fixed-price quotation. You see the scope in writing before you commit.
- Groundworks and structure. Foundations, drainage, walls and roof.
- First fix and kitchen. Electrics and plumbing are positioned, so the kitchen layout must be finalised with exact measurements by now, because socket and pipe positions depend on it.
- Finishing, inspection and handover. Final Building Control sign-off.
You can often stay at home while the extension is sealed off, but disruption rises when the wall is opened: dust, noise, temporary supports and short interruptions to water, power or the kitchen. Agree working hours, protection and access to essentials before the start. Set up a temporary kitchen in another room, with a kettle, microwave and fridge, for the weeks without your own.
When the build ends, after builders cleaning clears the fine plaster dust that settles on everything, so you can enjoy the new room from day one.
Common mistakes to avoid
- Starting with a wish list, not the house. Check what the structure, boundaries and drains allow first.
- Forgetting the contingency. Set aside 10 to 15% for surprises such as unexpected drainage or ground conditions.
- Over-glazing. Beautiful glass that triggers extra energy calculations and overheating wastes money. Plan glazing within the Part L limits.
- Late layout decisions. Changing the island position after first fix costs time and money.
- Comparing quotes that are not like for like. Make sure every quotation covers the same drawings and specification, including the kitchen, flooring, decoration and making good.
- Skipping neighbour conversations. A friendly word before work starts saves problems later.
Why homeowners choose us
We are a family-run company with more than 35 years of experience, and we manage projects from the first design discussion to final completion. Our quotations are fixed-price, so you know where you stand. We are members of the Guild of Master Craftsmen, an approved HUP! Building System partner, and an authorised REHAU installer, and we work across Warrington, St Helens, Wigan and Greater Manchester areas including Worsley, Walkden and Boothstown.
Our Kitchen Extensions page shows how the process works. If you want to see how a project runs from start to finish, our guide to what a rear kitchen extension involves is a good next read.
Our view from the job
Gareth here. The single biggest thing that makes a kitchen extension go well is deciding what the room is for before anyone talks about bricks. Families tell us they want space, and what they usually mean is light, a place for everyone to be together, and a door that opens onto the garden.
We design with that in mind, and we manage the build from the first drawing to the final handover, so there is one team and one point of contact. A fixed-price quotation means the conversation about money happens at the start, in plain terms, not halfway through the build.
If you are weighing up a rear extension against a wraparound, or a garage conversion against building out, come and talk to us at the house. Standing in the kitchen and looking at the garden answers more questions than any brochure.
Gareth
Talk to us about your Worsley kitchen
We design and build kitchen extensions, wraparound extensions, garage conversions and structural alterations for homeowners across the North West, and we supply and fit bi-folding doors, aluminium doors and replacement windows to go with them. Start with our house extensions page, or get in touch to arrange a visit.
FAQs
Do I need planning permission for a kitchen extension in Worsley?
Not always. Many single-storey rear extensions fall within permitted development limits, but those limits depend on your house type, previous extensions, and whether it is listed or in a conservation area. Approval is not automatic, so check with Salford City Council before you commit. We help you confirm the right route at design stage.
How much does a kitchen extension cost?
Published guides put single-storey extensions at roughly £1,750 to £3,000 per m² for the structure, with the kitchen, VAT, fees and contingency on top. Your total depends on size, glazing, access, drainage and structural work. A fixed-price quotation after a site visit is the reliable figure.
How long does a kitchen extension take?
A straightforward single-storey build usually takes three to six months on site, with design and approvals before that. Extra glazing or remodelling the whole ground floor can lengthen it.
Can I stay at home during the build?
Often yes, as the extension is sealed off from the house for much of the work. Disruption increases when the existing wall is opened, so plan a temporary kitchen and agree working hours with your builder.
Is a garage conversion a cheaper way to get a bigger kitchen?
It can be, because the walls and roof already exist. The work still needs insulation, a proper floor and Building Regulations approval, and it only suits homes with an attached garage next to the kitchen.
Sources
- Crombouke Fold, Ellenbrook, Worsley kitchen extension
- Extensions and Alterations Guidance Booklet, Part L and F
- FMB: House extensions, the ultimate guide
- Homebuilding: kitchen extension costs
- Ideal Home: extending your kitchen on a budget
- UK Building Costs 2026: prices per m²
- 3 metre house extension cost 2026
- The Town and Country Planning (General Permitted Development) Order 2015, Schedule 2, Part 1
- FMB: Planning a kitchen, the ultimate guide
- Homebuilding: six key steps to adding a kitchen extension
- After builders cleaning in Manchester
