Skip to main content

Get in touch

Request a Fixed Quote

Request a Brochure

In England, yes, in most cases the work must comply with the Building Regulations. Whether you need to make a building control application yourself depends on who fits the doors and what happens to the wall. A registered installer can self-certify a like-for-like replacement. If the opening changes size, or a new opening is formed, you need an application to your council or an approved inspector.

We fit bi-folding doors for homeowners across Warrington, St Helens, Wigan, Rainhill, Haydock and the wider North West. This guide explains what the rules say, which certificate to ask for, and how to avoid trouble when you come to sell.

Complete-Property-Solutions
Plan Your Bi-Fold Door Project
Complete Property Solutions fits bi-folding doors across the North West, with project management from the initial design stage through to completion.

Explore bi-folding doors

TL;DR

  • Bi-folding doors are glazed external doors, so they come within the Building Regulations. Most repairs and replacements are exempt, but glazing is not.
  • A like-for-like swap in an existing opening, fitted by an installer on a Competent Person Scheme, needs no separate application. You receive a compliance certificate instead.
  • Widening an opening, forming a new one or removing wall needs a full plans application or building notice, plus structural calculations.
  • Planning permission is a separate process and is rarely needed for bi-folds alone, but check if your home is listed or in a conservation area.
  • Doors fitted without sign-off can be fixed later through regularisation, but it is far easier to get it right first time.

Table of Contents

The short answer: three common situations

Most homeowners fall into one of three cases. Find yours in this table.

Your projectBuilding control application needed?What you should receive
Replacing old patio or French doors with bi-folds in the same opening, using a registered installerNo separate applicationCompetent Person Scheme certificate
Replacing doors in the same opening, but the installer is not registeredYes, full plans or building noticeCompletion certificate from building control
Widening or narrowing the opening, or cutting a new oneYes, alwaysCompletion certificate from building control
Bi-folds in a conservatory, outbuilding or listed buildingUsually yesCompletion certificate from building control

The rest of this article explains why each row sits where it does.

Why bi-folding doors come under the Building Regulations

People often assume a door is exempt. GOV.UK says that external doors are exempt if less than half of the door is glazed. Bi-folds are almost entirely glass, so they fall outside that exemption. One council’s technical guidance makes the same point: replacing a door with more than 50% of its area glazed counts as building work.

This has been the position for a long time. Hertfordshire Building Control’s guide notes that since 2002 all replacement windows and doors have come within the scope of the Regulations. That is why a reputable installer will talk to you about certification before they talk about colours.

What the regulations actually check

Building control is not there to catch you out. It checks three things that matter to anyone living with large glass doors.

Energy efficiency

Replacement doors in existing homes must meet a maximum U-value of 1.4 W/m²K. The U-value measures heat loss: the lower the number, the better the door keeps your warmth in. The British Woodworking Federation explains that the limits depend on how much of the door is glazed, with a more generous option for doors that are over 60% glass based on a Window Energy Rating band. Good aluminium bi-folds with modern thermal breaks and double or triple glazing are designed to meet these figures. If you want to go deeper, our guide to Part L U-values and the 1.4 W/m²K rule covers the detail.

Safety glass

Glass in doors must break safely. Pilkington’s guidance states that glazing in doors within 1500mm of floor level must be at least Class C to BS 6206, and Class B where the smaller pane dimension exceeds 900mm. In plain terms, this means toughened or laminated glass. Bi-fold panels are tall and wide, so toughened glass is the norm.

Support above the opening

This is the one that catches people out. Hertfordshire Building Control says someone suitable must assess the support above the opening, which matters especially with top-hung bifold doors. Top-hung systems carry the weight of the folded doors from the head, so the lintel or beam must be able to take it without deflecting.

Old patio door openings often have a modest lintel sized for a lighter sliding unit. If you are unsure how a wall is carrying load, it helps to identify a load-bearing wall before anyone starts cutting. On our own projects, we check the lintel at survey stage, long before the doors are ordered.

When the installer can certify the work

There are two accepted ways of proving compliance, according to Hertfordshire Building Control: a local authority certificate, or a certificate from an installer registered with a Competent Persons Scheme. FENSA is the best-known scheme for windows and doors. One building control body confirms that with a FENSA-registered installer you do not need to submit a full plans application or building notice, because the installer provides the certificate.

The certificate should reach you within 30 days of completion. It also shows up in property searches when you sell, so keep it with your deeds.

Where self-certification does not apply

This route has limits. FENSA’s own guide says that work on outbuildings, conservatories and listed buildings falls outside the scheme. So if your bi-folds are going into a conservatory, a garden room or a listed home, expect to deal with building control directly. The same guide adds that an indemnity policy is not a suitable alternative to meeting the Regulations in full.

When you do need to apply

When you do need to apply

A formal application is required when the structure changes. CNC Building Control says you need one if you alter the structural opening size, larger or smaller, and in most cases where the building is listed or in a sensitive setting. Another authority states that forming a new opening under a new lintel needs a full plans application or building notice.

The typical triggers in North West homes are:

  • Replacing a standard 1.8m patio door with a 3m or 4m bi-fold set, which needs a wider opening and a new beam. Our guide to practical bifold door widths shows what is realistic.
  • Opening up a rear wall of a 1930s semi in Great Sankey or Penketh to create an open-plan kitchen diner.
  • Fitting bi-folds into a new single-storey or wraparound extension, where the whole build is inspected anyway.
  • Combining bi-folds with a garage conversion, where garage conversion building regulations also apply.

Full plans or building notice?

You can notify your council in two ways. Walsall Council’s guidance explains the choice: a full plans application or a building notice. Where structural alterations or steel beams are involved, structural calculations are likely to be required, and approval is valid for three years. A full plans application gets your drawings checked before work starts, which suits a bigger opening. A building notice lets work begin sooner, with inspections as it progresses.

To see what inspectors look at on site, read what building control does. Our building regulations page sets out how we handle this on our projects.

Planning permission is a separate question

Building Regulations and planning permission are two different systems. Building Regulations deal with how the work is built. Planning deals with how it looks and affects the area. Swapping doors in an existing opening rarely changes the look of a house enough to need planning permission, so bi-folds alone seldom require it.

The exceptions are worth checking with your local planning authority: listed buildings, conservation areas, homes where permitted development rights have been removed, and flats. If the bi-folds are part of a larger extension, the extension itself may need planning consent or fall under permitted development. Passing one process does not exempt you from the other.

Planning permission is a separate question

What if the doors are already fitted without sign-off?

This comes up often when someone buys a house with a conservatory or extension and the paperwork is missing. The fix is called regularisation. East Devon District Council explains that you can gain retrospective approval through a Regularisation Application, and the surveyor may ask you to open up the work so they can assess it.

The key details:

Nottingham City Council puts it bluntly: there is no legal requirement to apply for a regularisation certificate, but there is a legal requirement to comply with Building Regulations. If you are buying, ask the seller’s solicitor for the certificate early.

Our perspective

In more than 35 years of building, the bi-fold jobs that go wrong are almost never about the doors. They go wrong because nobody looked at what sits above them.

A bi-fold set is heavy, and a top-hung system hangs all that weight from the head. We always survey the lintel first, and where the opening needs to be wider we specify the steel, arrange the calculations and deal with building control as part of the fixed-price quote. You should not have to chase paperwork after the builders leave.

As a member of the Guild of Master Craftsmen and an authorised REHAU installer, we treat the certificate as part of the job, not an extra. Our aim is that the doors you love today are still a selling point when you move, with every document in the folder.

Gareth

Timescales and common mistakes

A like-for-like bi-fold replacement is usually a short job on site, often a day or two once the doors are made. Lead times for made-to-measure frames add weeks beforehand. If a structural opening is involved, allow extra time for design, calculations and the council’s checking of a full plans application, then the build and inspections. Your installer should give you a realistic programme before you sign.

The mistakes we see most often:

  1. Assuming no approval is needed. Because bi-folds are mostly glass, the exemption for external doors does not apply.
  2. Choosing an installer who is not registered. You then become responsible for notifying building control, which means an application, fees and inspections you did not plan for.
  3. Ignoring the lintel. A wider or heavier door on an old, undersized lintel risks sagging and doors that bind.
  4. Forgetting conservatories. Self-certification schemes exclude them, so the route differs.
  5. Not keeping the certificate. It should be issued within 30 days. Chase it if it does not arrive.
  6. Overlooking security and glazing detail. Locks and glass specification matter as much as the frame; see how secure aluminium bifold doors are.

Building control costs are set by each council, so ask your local authority for its current fee scale rather than relying on a general figure. We are happy to explain which route suits your property when we quote.

Bi-folding doors from Complete Property Solutions

We design, supply and install bi-folding doors as part of a fully managed service, whether that is a straight replacement or part of a larger project. We work in Warrington, St Helens, Wigan, Culcheth, Lowton, Haydock, Rainhill and surrounding areas, and our quotations are fixed-price. Where the opening changes, our structural alterations service covers the beam, the calculations and the building control sign-off.

Complete-Property-Solutions

To talk through your project, get in touch with our team and we will survey the opening and explain exactly what paperwork your doors need.

FAQ

Can I fit bi-folding doors myself without telling building control?

No. Doing the work yourself means you must notify building control separately, because there is no registered installer to certify it. You would need a building notice or full plans application and inspections. If you are not confident about the lintel and glazing standards, use a registered installer.

Do bi-folding doors need planning permission?

Rarely. Replacing doors in an existing opening usually does not change the character of a house enough to need it. Listed buildings, conservation areas and homes with permitted development rights removed are the main exceptions, so confirm with your local planning authority first.

How long does a bi-fold door certificate take to arrive?

A Competent Person Scheme certificate should be issued within 30 days of completion. If you applied through building control instead, you receive a completion certificate once the final inspection is passed.

What U-value should my new bi-folds achieve?

Replacement doors in existing homes in England must achieve a maximum of 1.4 W/m²K, or meet the Window Energy Rating alternative where it applies. Your installer should confirm the figure for your chosen system in writing.

Can I fix doors that were installed without approval?

Yes, in most cases. A regularisation application can cover work carried out after 11 November 1985, though the council may ask for some work to be opened up or altered. It is best to start before you put the house on the market.

Sources

Request a Fixed Quote

Simply fill in your details for your free, no-obligation quote. Quality at an affordable price.

Name
Promotional Emails

Speak with one of our friendly advisors on 01925 223 297

Our team will be more than happy to help with any questions you may have